MARSHLAND SCHOOL CHRISTCHURCH

Background

MultiMedia Communications were contracted with City Care working on Stage One of the Marshland School build.

Time Frame

The MultiMedia Communications team began working on this project in July 2015 and was successfully completed on time and on budget in March 2016.

0

metres of Molex cat6 cable

0

data Outlets

0

data cabinets

0

metres of air blown fibre optic cable

MMC INVOLVEMENT

This Marshland School project included all the ICT Data Cabling, which have had 5x data cabinets with over 350 data outlets in place and have totally consumed over 18000 metres of molex cat6 cable connected with 500 metres of air blown fibre optic cable. We also have installed full PA system with local zone inputs and AV cabling.

Outcomes

This was a highly rewarding project that MMC completed on time and on budget and it was so successful that MMC picked up stage 2 of the build which included 2 x more Hubs.

other commercial projects

The trackable quality records and close relationships with NZ leading companies ensure the success in delivering of client-satisfactory and state-of-the-art large commercial projects, to name a few of our projects: Genesis Energy Waikato ICT and Security Systems, CDHB Christchurch Outpatients Building, Synlait Milk Plant, Enable Christchurch UFB Rollout, Crown Plaza Christchurch ICT and MATV, Isaac Theatre Royal and AJ Hacket NZ Bungy Jumping Fibre Optic and ICT Networks. Feel free to click the link to check out these featured projects.